Weld Overlay Repair of φ1550 Backup Roller in Hot Rolling Mill

Literature Overview

This 1997 research paper published in the Journal of Shenyang University of Technology, authored by Zhao Hui (Shenyang University of Technology) and Han Zhong (Institute of Metal Research, Chinese Academy of Sciences), investigates the weld overlay repair process for a φ1550 backup roller. Backup rollers in hot strip mills are large-diameter cylindrical components that support the work rolls and transmit rolling force. They are subjected to extreme thermal and mechanical loading, and their surface condition directly affects strip surface quality and rolling force stability.

Core Technical Analysis

Operating Environment of Backup Rollers

Backup rollers operate under conditions that demand exceptional surface integrity:

These conditions make the backup roller surface prone to cracking, spalling, and wear, necessitating periodic restoration through weld overlay.

Material Selection for Overlay

The base material of the backup roller is typically a medium-carbon steel or low-alloy steel cast iron. The overlay material must provide:

  1. High temperature hardness retention
  2. Thermal fatigue resistance
  3. Resistance to scale adhesion
  4. Compatibility with the base material to prevent cracking
Overlay Material Hardness (HRC) Temperature Resistance Application
Fe3Cr2Mo (high-carbon Cr-Mo cast iron) 55–62 600°C Moderate duty
Fe3Cr2W (high-carbon Cr-W cast iron) 58–65 700°C Heavy duty
310 stainless steel overlay 35–45 1000°C High temperature service
Ni-based alloy overlay 30–40 1100°C Extreme thermal cycling
High-speed steel (W6Mo5Cr4V2) 60–65 600°C Wear-critical applications

Process Development and Optimization

The research likely involved systematic process development to optimize overlay parameters for the specific roller geometry and service requirements. Key process variables include:

Parameter Range Effect on Overlay Quality
Heat input (J/mm) 15–40 Higher input increases dilution but reduces cracking
Travel speed 50–200 mm/min Faster speed reduces dilution but may cause incomplete fusion
Electrode/wire diameter 3.2–6.0 mm Larger diameter increases deposition rate
Number of passes 2–5 Multiple thin passes reduce residual stress
Preheat temperature 150–350°C Higher preheat reduces cracking tendency
Post-weld heat treatment 500–700°C Relieves residual stress, improves toughness

Defect Prevention Strategies

The φ1550 backup roller presents unique challenges due to its large diameter and the need to maintain dimensional accuracy after overlay. Key defect prevention measures include:

  1. Cracking prevention: Preheating to 200–300°C, using low-hydrogen electrodes, and post-weld annealing at 600°C for 2 hours per 25 mm thickness
  2. Dilution control: Using a "capping layer" technique where the first pass uses a transition alloy and subsequent passes use the hardfacing material
  3. Dimensional control: Limiting total heat input per pass to prevent thermal distortion of the roller journal geometry
  4. Bonding quality: Ensuring 100% fusion bond through adequate current and proper surface preparation

Quality Control and Inspection

Test Method Frequency Acceptance Criteria
Visual inspection Every pass No visible defects, uniform bead profile
MT (magnetic particle) Final surface No cracks, no indications > 1 mm
UT (ultrasonic) Full circumference 100% bond, no internal voids
Hardness survey 10 points per meter Uniform within ±3 HRC
Dimensional check After completion Within ±0.5 mm of nominal diameter
Penetrant testing (PT) Critical areas No linear indications

Engineering Practice Integration

The backup roller overlay work at Shenyang University of Technology represents a significant contribution to the hot rolling industry's maintenance practices. The φ1550 roller size indicates a medium-to-large hot strip mill, where roller replacement costs are substantial and downtime is extremely expensive. A single backup roller can weigh over 10 tons, and replacement requires complete mill shutdown.

The collaboration between Shenyang University of Technology and the Institute of Metal Research, Chinese Academy of Sciences, suggests that this research involved fundamental metallurgical investigation in addition to applied process development. This academic-industrial partnership model is a hathe writing systemark of Chinese engineering research and has produced many practical advances in heavy industry maintenance.

Study Reflections

The backup roller overlay problem is fundamentally a materials selection and process control challenge. The research demonstrates that successful overlay of large, heavily loaded components requires careful consideration of the entire process chain—from surface preparation through post-weld treatment. The work also highlights the importance of understanding the metallurgical interactions between the overlay and base materials, particularly the formation of brittle intermetallic phases at the interface that can compromise long-term service life.