CLADTECH-LOGOCLADDING TECHNOLOGY SHANXI CO., LTD
CLADDING TECHNOLOGY SHANXI CO., LTD
CLADDING · BIMETAL PRODUCT · BIMETAL PRESSURE VESSEL TECHNICAL STUDY

Offline Cladding Device for Vertical Mill Roller Sleeve in Cement Industry

Literature Overview

This study, published in 2020 by researchers from Nanyang Zhonglian Cement Co., Ltd. and Sichuan University, addresses a critical maintenance challenge in the cement grinding industry: the offline repair and hardfacing of vertical mill roller sleeves. Vertical roller mills are workhorse equipment in modern cement plants, where the roller sleeves undergo severe abrasive wear from grinding clinker, raw meal, and mixed materials. The development of a dedicated offline cladding apparatus represents a significant advancement in extending roller sleeve service life while minimizing production downtime.

Core Technical Challenges

The vertical mill roller sleeve presents unique cladding challenges that distinguish it from conventional cylindrical or planar overlay applications:

Process Analysis and Key Parameters

The offline cladding device integrates mechanical positioning, thermal preheating, and automated welding into a coordinated system. Based on engineering principles and industry practice, the typical process parameters are as follows:

Parameter Typical Value Rationale
Preheat temperature 200–350 °C Reduces thermal gradient; prevents cold cracking in HAZ
Interpass temperature 150–250 °C Controls heat input per pass; maintains metallurgical integrity
Welding method SAW (Submerged Arc Welding) or FCAW High deposition rate; suitable for thick overlay layers
Overlay thickness 8–20 mm Balances abrasion resistance with cost and distortion control
Number of passes 3–5 layers Ensures dilution control; achieves desired overlay chemistry
Post-weld heat treatment (PWHT) 550–650 °C, 2–4 h Relieves residual stresses; stabilizes microstructure
Cooling rate ≤ 50 °C/h Prevents hydrogen-induced cracking in HAZ

Defect Analysis and Countermeasures

The following table summarizes common defects encountered during roller sleeve cladding and their countermeasures:

Defect Type Root Cause Countermeasure
Overlay spalling Excessive dilution; thermal shock; high residual stress Reduce heat input; increase preheat; apply PWHT
Cracking in HAZ High carbon equivalent of base metal; hydrogen embrittlement Use low-hydrogen consumables; preheat adequately
Pore formation Contaminated surface; insufficient flux coverage Thorough surface preparation; verify flux dryness
Uneven overlay thickness Tracking inaccuracy; operator inconsistency Automated tracking system; programmed arc manipulation
Interlayer cold cracking High restraint; inadequate interpass temperature Increase interpass temperature; reduce pass thickness

Integration with Engineering Practice

In cement plant operations, roller sleeve cladding is typically performed during scheduled maintenance shutdowns. The offline device allows the roller sleeve to be removed from the mill housing, transported to the cladding facility, and processed in a controlled environment. Key engineering considerations include:

  1. Logistics planning: The removal, transport, and reinstallation of a roller sleeve must be scheduled within the plant maintenance window, typically 7–14 days.
  2. Dimensional accuracy: Post-cladding machining to restore the sleeve profile to specified tolerance (typically ±0.5 mm per meter) is essential for proper mill operation.
  3. Quality verification: Visual inspection, magnetic particle testing (MT) for surface defects, and ultrasonic testing (UT) for subsurface bonding quality are mandatory per relevant standards such as NB/T 47013.
  4. Cost-benefit analysis: A typical cladding operation costs 15–25% of a new roller sleeve, while extending service life by 3–5 times compared to an uncladded sleeve.

Study Insights and Implications

This literature highlights the convergence of specialized equipment design with welding metallurgy in heavy industry maintenance. The development of purpose-built offline cladding apparatus reflects a broader trend toward standardizing repair processes that were previously artisanal and inconsistent. From a materials engineering perspective, the challenge lies in achieving a metallurgically sound bond between a low-alloy steel substrate and a high-alloy, high-carbon overlay without introducing brittle intermetallic phases at the interface. The collaboration between an industrial user (Nanyang Zhonglian Cement) and an academic institution (Sichuan University) exemplifies the productive synergy between practical problem-solving and fundamental research. For engineers working on similar applications, the key takeaway is that successful cladding of large, heavily restrained components demands not only proper consumable selection and process parameters but also a holistic approach to thermal management, equipment capability, and quality assurance integration.